top of page

CONOCE NUESTRO BLOG


The Flaw of Averages in Mine Project Evaluation
By Dr. Luis A. Martínez Tipe, PhD Director General & Principal Researcher, CAIDTech Originally published: September 3, 2015 Fuente: Savage, S. (2000). The Flaw of Averages. reproduced with permission. INTRODUCTION Traditionally, mine organisations use various types of quantitative methods to estimate profit and loss associated with a proposed mine project. Among all these measures of profitability, the Net Present Value (NPV) that is based on the Discounted Cash Flow (DCF)
14 abr5 Min. de lectura
bottom of page